Skip to main content

Posts

Featured

seci-invites-bids-for-125-mw-500-mwh-standalone-bess-projects-in-odisha

PROJECT OVERVIEW  Setting up of 125MW/500MWH standalone Battery Energy Storage System in Odisha under Tarrif Based Competitive Bidding with Viability Gap Funding supported through PSDF. TYPE OF TENDER Single stage Two Envelope Online Bidding system followed bye-reverse Auction  KEY DATES Tender Release Date - 18/12/2025 Pre-Bid Date - 2/01/2026 https://wwseci-invites-bids-for-125-mw-500-mwh-standalone-bess-projects-in-odisha Bid Submission Date - 20/02026 Reverse Auction - yes Bid Validity - 12 months Maximum Capacity - 125MW Minimum Capacity - 125MW Project - 125MW/500MWH Standalone BESS(4 hr storage) Location - Setup inside the identified Substation of the STU network in the state of           odisha.Land will be provided on Right to use basis to the BESS. Procurer/End Buyer - Gridco/Optcl VGF - INR1800000 per MWH BESPA Period - 15 Years Supply to Gridco EMD - INR900000 per MW PBG - INR2250000 Per MW BID Processing Fees - Max INR1...

Latest Posts